Studiotech translated Arup’s concept into a deliverable solution through a comprehensive service package, including engineering design, electrical design, DMX system design, bespoke fixture mounting bracket design and manufacture, supply, installation, as well as control and programming. "A key aspect of the engineering design included accommodating the listed status of the bridge as we were unable to drill or mechanically fix to the Grade II listed structure. To overcome this challenge, we devised a clamping mechanism for each bracket, containment, and cabling, specifically designed to prevent any damage to the historic bridge," stated Studiotech engineers.